{"id":3290,"date":"2024-02-26T16:34:57","date_gmt":"2024-02-26T09:34:57","guid":{"rendered":"https:\/\/www.petrosync.com\/blog\/?p=3290"},"modified":"2025-07-07T14:59:32","modified_gmt":"2025-07-07T07:59:32","slug":"what-is-cased-hole-logging","status":"publish","type":"post","link":"https:\/\/www.petrosync.com\/blog\/what-is-cased-hole-logging\/","title":{"rendered":"Cased Hole Logging as The Key Role in Reservoir Evaluation"},"content":{"rendered":"<div id=\"bsf_rt_marker\"><\/div><p class=\"ai-optimize-6 ai-optimize-introduction\">In the world of oil and gas, evaluating reservoirs is vital for success. <a href=\"https:\/\/www.petrosync.com\/blog\/what-is-cased-hole-logging\/\" target=\"_blank\" rel=\"noopener\">Cased hole logging<\/a> is a critical tool in this process, helping us understand what&#8217;s beneath the surface. Before we dive into the details of cased hole logging and its role in reservoir evaluation, let&#8217;s first grasp why it&#8217;s so important. This introduction aims to explain why cased hole log matters in assessing reservoirs.<\/p>\n<h2 class=\"ai-optimize-7\"><b>What Is A Cased Hole Log?<\/b><\/h2>\n<p class=\"ai-optimize-8\">A cased hole log involves retrieving logging measurements through the well casing, or the metal piping that is inserted into the well during <a href=\"https:\/\/www.petrosync.com\/blog\/what-is-well-completion\/\" target=\"_blank\" rel=\"noopener\">completion<\/a> operations, and is a type of well log used in oil and gas exploration and production.<\/p>\n<figure id=\"attachment_3293\" aria-describedby=\"caption-attachment-3293\" style=\"width: 400px\" class=\"wp-caption alignnone\"><img fetchpriority=\"high\" decoding=\"async\" class=\"size-full wp-image-3293\" src=\"https:\/\/www.petrosync.com\/blog\/wp-content\/uploads\/2024\/02\/density_log-1-jpg.webp\" alt=\"Density Log (Credit: Geoline Service)\" width=\"400\" height=\"400\" \/><figcaption id=\"caption-attachment-3293\" class=\"wp-caption-text\">Density Log (Credit: Geoline Service)<\/figcaption><\/figure>\n<p class=\"ai-optimize-9\">These measurements are taken after the well has been drilled and cased with steel tubing. Cased hole logs provide valuable information about the surrounding rock formations and fluids, aiding operators in making decisions about well performance, production strategies, and potential interventions to optimize production and maximize hydrocarbon recovery.<\/p>\n<h2 class=\"ai-optimize-10\"><b>What Is an Open Hole in Casing?<\/b><\/h2>\n<p class=\"ai-optimize-11\">An open hole in casing refers to sections of the wellbore, those where the wellbore is left uncased or partially cased from the reservoir section to the surface, where the casing, or the metal tubing inserted into the well, does not completely cover the surrounding rock formations.<\/p>\n<p class=\"ai-optimize-12\">Instead, the rock formations are left exposed or &#8220;open&#8221; without the protective barrier of the casing. This allows for direct contact between the wellbore and the formations, which can be advantageous for certain operations such as logging or well testing. However, it also poses risks such as instability or fluid migration if not properly managed.<\/p>\n<h2 class=\"ai-optimize-13\"><b>What Is The Difference Between Cased and Open Hole Logging?<\/b><\/h2>\n<p class=\"ai-optimize-14\">Cased hole logging and open hole logging are two methods used to gather information about the subsurface formations in oil and gas wells, but they differ in the conditions under which they are performed.<\/p>\n<p class=\"ai-optimize-15\">Cased hole logging involves running instruments down the wellbore after the well has been drilled and cased with steel tubing. This method is used when the well has been completed and the casing is in place. Cased hole log provides information about the condition of the casing, as well as the formations surrounding it.<\/p>\n<p class=\"ai-optimize-16\">On the other hand, open hole logging is conducted before the well is cased or after the casing has been removed or perforated in certain sections. This method allows for direct measurements of the formations without the obstruction of the casing. Open hole logging provides detailed information about the properties of the formations, which can be valuable for reservoir evaluation and well planning.<\/p>\n<table>\n<tbody>\n<tr>\n<td>\n<p class=\"ai-optimize-17\" style=\"text-align: center;\"><b>Open hole<\/b><\/p>\n<\/td>\n<td>\n<p class=\"ai-optimize-18\" style=\"text-align: center;\"><b>Cased Hole<\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>Better Data Quality<\/td>\n<td>Not using valuable rig time<\/td>\n<\/tr>\n<tr>\n<td>Fewer Environmental Effects<\/td>\n<td>Much lower risk of tool loss including radioactive sources<\/td>\n<\/tr>\n<tr>\n<td>More Measurement Choices<\/td>\n<td>Ease of deployment<\/td>\n<\/tr>\n<tr>\n<td>Completion Decision Prior to Setting Casing<\/td>\n<td>Use of tractors in high angle and horizontal wellbores<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p class=\"ai-optimize-19\">In summary, the main difference between cased hole and open hole logging lies in the presence or absence of casing in the wellbore at the time of logging, with each method offering unique advantages depending on the stage of well construction and the objectives of the logging operation.<\/p>\n<h2 class=\"ai-optimize-20\"><b>What Are The Use of Cased Hole Logging?<\/b><\/h2>\n<p class=\"ai-optimize-21\">Cased hole logging is used for several purposes in oil and gas wells:<\/p>\n<h3 class=\"ai-optimize-22\"><b>1. Downhole Flow<\/b><\/h3>\n<p class=\"ai-optimize-23\">Cased hole logging helps measure the flow of fluids within the wellbore. By analyzing the responses of logging tools, operators can determine the presence, type, and movement of fluids such as oil, gas, and water in the well. This information is crucial for evaluating reservoir productivity and optimizing production strategies.<\/p>\n<h3 class=\"ai-optimize-24\"><b>2. Casing Condition<\/b><\/h3>\n<p class=\"ai-optimize-25\">Cased hole logging allows for the assessment of the condition of the casing, or the metal tubing inserted into the well. It helps identify any defects, corrosion, or damage to the casing that could compromise well integrity or lead to fluid leaks. By detecting issues early, operators can take preventive measures to maintain the structural integrity of the wellbore.<\/p>\n<h3 class=\"ai-optimize-26\"><b>3. Cement Integrity<\/b><\/h3>\n<p class=\"ai-optimize-27\">Another important use of cased hole logging is to evaluate the integrity of the cement sheath surrounding the casing. Proper cementing is essential for isolating the wellbore from surrounding formations and preventing fluid migration between different zones. Case hole logging helps identify any gaps, channels, or other defects in the cement, allowing for remedial action if needed to ensure zonal isolation and wellbore integrity.<\/p>\n<h3 class=\"ai-optimize-28\"><b>4. Formation Properties<\/b><\/h3>\n<p class=\"ai-optimize-29\">Case hole logging also provides valuable information about the properties of the formations surrounding the wellbore. By analyzing the responses of logging tools to various formations, operators can characterize lithology, porosity, permeability, and other reservoir properties. This information aids in reservoir evaluation, hydrocarbon resource assessment, and well planning, helping operators make informed decisions about production and reservoir management strategies.<\/p>\n<p class=\"ai-optimize-30\">In summary, cased hole log plays a critical role in evaluating downhole flow, assessing casing condition and cement integrity, and characterizing formation properties. These insights are essential for optimizing well performance, ensuring wellbore integrity, and maximizing hydrocarbon recovery in oil and gas production operations.<\/p>\n<p class=\"ai-optimize-31\">In conclusion, cased hole logging plays a crucial role in oil and gas exploration and production. By providing valuable insights into downhole flow, casing condition, cement integrity, and formation properties, cased hole logging enables operators to make informed decisions about well performance, integrity, and productivity.<\/p>\n<p class=\"ai-optimize-32\">The ability to assess these factors accurately and efficiently is essential for optimizing production, ensuring wellbore integrity, and maximizing hydrocarbon recovery. As such, this logging is an indispensable tool for maintaining operational efficiency, minimizing risks, and ultimately achieving success in oil and gas operations.<\/p>\n<p class=\"ai-optimize-33\">As you&#8217;ve discovered the critical role of cased hole logging in ensuring well integrity and optimizing production in oil and gas operations, it&#8217;s essential to deepen your understanding through specialized training. <a href=\"https:\/\/www.petrosync.com\/\" target=\"_blank\" rel=\"noopener\">PetroSync<\/a> offers a comprehensive Well Integrity Cased Hole Logging Interpretation course designed to equip you with the knowledge and skills needed to interpret case hole logging data effectively.<\/p>\n<p class=\"ai-optimize-34\">By enrolling in this training, you&#8217;ll gain insights into advanced techniques for assessing well integrity, analyzing formation properties, and making informed decisions to optimize well performance. Don&#8217;t miss this opportunity to enhance your expertise and stay ahead in the industry. Join us for the Well Integrity Cased Hole Logging Interpretation training with PetroSync.<\/p>\n<p class=\"ai-optimize-35\">Credit header image: Research Gate \/ Terence O&#8217;Sullivan<\/p>\n<p class=\"ai-optimize-36\">\t\t<div data-elementor-type=\"section\" data-elementor-id=\"2223\" class=\"elementor elementor-2223\">\n\t\t\t\t\t<div class=\"elementor-section-wrap\">\n\t\t\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-8a7560b elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"8a7560b\" data-element_type=\"section\" id=\"form\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-c15af96\" data-id=\"c15af96\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-f2acf57 elementor-widget elementor-widget-heading\" data-id=\"f2acf57\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Reserve Your Training Seat!<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ec6625b elementor-widget elementor-widget-text-editor\" data-id=\"ec6625b\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-family: Poppins, sans-serif; font-size: 16px;\">Enhance your skills with the latest industry knowledge. Kickstart your career growth with PetroSync training today!<\/span><br><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-72ab46d elementor-widget elementor-widget-shortcode\" data-id=\"72ab46d\" data-element_type=\"widget\" data-widget_type=\"shortcode.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-shortcode\"><div class=\"forminator-ui forminator-custom-form forminator-custom-form-2174 forminator-design--default forminator-enclosed forminator_ajax\" data-forminator-render=\"0\" data-form=\"forminator-module-2174\" data-uid=\"69f04ef06dade\"><br\/><\/div><form\n\t\t\t\tid=\"forminator-module-2174\"\n\t\t\t\tclass=\"forminator-ui forminator-custom-form forminator-custom-form-2174 forminator-design--default forminator-enclosed forminator_ajax\"\n\t\t\t\tmethod=\"post\"\n\t\t\t\tdata-forminator-render=\"0\"\n\t\t\t\tdata-form-id=\"2174\"\n\t\t\t\t data-color-option=\"default\" data-design=\"default\" data-grid=\"enclosed\" style=\"display: none;\"\n\t\t\t\tdata-uid=\"69f04ef06dade\"\n\t\t\t><div role=\"alert\" aria-live=\"polite\" class=\"forminator-response-message forminator-error\" aria-hidden=\"true\"><\/div><div class=\"forminator-row\"><div id=\"name-1\" class=\"forminator-field-name forminator-col forminator-col-12 \"><div class=\"forminator-field\"><label for=\"forminator-field-name-1_69f04ef06dade\" id=\"forminator-field-name-1_69f04ef06dade-label\" class=\"forminator-label\">Full Name <span class=\"forminator-required\">*<\/span><\/label><input type=\"text\" name=\"name-1\" value=\"\" placeholder=\"\" id=\"forminator-field-name-1_69f04ef06dade\" class=\"forminator-input forminator-name--field\" aria-required=\"true\" autocomplete=\"name\" \/><\/div><\/div><\/div><div class=\"forminator-row\"><div id=\"text-2\" class=\"forminator-field-text forminator-col forminator-col-6 \"><div class=\"forminator-field\"><label for=\"forminator-field-text-2_69f04ef06dade\" id=\"forminator-field-text-2_69f04ef06dade-label\" class=\"forminator-label\">Company Name <span class=\"forminator-required\">*<\/span><\/label><input type=\"text\" name=\"text-2\" value=\"\" placeholder=\"\" id=\"forminator-field-text-2_69f04ef06dade\" class=\"forminator-input forminator-name--field\" data-required=\"1\" \/><\/div><\/div><div id=\"text-1\" class=\"forminator-field-text forminator-col forminator-col-6 \"><div class=\"forminator-field\"><label for=\"forminator-field-text-1_69f04ef06dade\" id=\"forminator-field-text-1_69f04ef06dade-label\" class=\"forminator-label\">Job Title <span class=\"forminator-required\">*<\/span><\/label><input type=\"text\" name=\"text-1\" value=\"\" placeholder=\"\" id=\"forminator-field-text-1_69f04ef06dade\" class=\"forminator-input forminator-name--field\" data-required=\"1\" \/><\/div><\/div><\/div><div class=\"forminator-row\"><div id=\"email-1\" class=\"forminator-field-email forminator-col forminator-col-6 \"><div class=\"forminator-field\"><label for=\"forminator-field-email-1_69f04ef06dade\" id=\"forminator-field-email-1_69f04ef06dade-label\" class=\"forminator-label\">Email Address <span class=\"forminator-required\">*<\/span><\/label><input type=\"email\" name=\"email-1\" value=\"\" placeholder=\"\" id=\"forminator-field-email-1_69f04ef06dade\" class=\"forminator-input forminator-email--field\" data-required=\"1\" aria-required=\"true\" autocomplete=\"email\" aria-describedby=\"forminator-field-email-1_69f04ef06dade-description\" \/><span id=\"forminator-field-email-1_69f04ef06dade-description\" class=\"forminator-description\">Please fill with your business email.<\/span><\/div><\/div><div id=\"phone-1\" class=\"forminator-field-phone forminator-col forminator-col-6 \"><div class=\"forminator-field\"><label for=\"forminator-field-phone-1_69f04ef06dade\" id=\"forminator-field-phone-1_69f04ef06dade-label\" class=\"forminator-label\">WhatsApp Number <span class=\"forminator-required\">*<\/span><\/label><input type=\"text\" name=\"phone-1\" value=\"\" placeholder=\"\" id=\"forminator-field-phone-1_69f04ef06dade\" class=\"forminator-input forminator-field--phone\" data-required=\"1\" aria-required=\"true\" autocomplete=\"off\" data-national_mode=\"disabled\" data-country=\"sg\" data-validation=\"international\" \/><\/div><\/div><\/div><div class=\"forminator-row\"><div id=\"text-4\" class=\"forminator-field-text forminator-col forminator-col-6 \"><div class=\"forminator-field\"><label for=\"forminator-field-text-4_69f04ef06dade\" id=\"forminator-field-text-4_69f04ef06dade-label\" class=\"forminator-label\">Country <span class=\"forminator-required\">*<\/span><\/label><input type=\"text\" name=\"text-4\" value=\"\" placeholder=\"\" id=\"forminator-field-text-4_69f04ef06dade\" class=\"forminator-input forminator-name--field\" data-required=\"1\" \/><\/div><\/div><div id=\"text-6\" class=\"forminator-field-text forminator-col forminator-col-6 \"><div class=\"forminator-field\"><label for=\"forminator-field-text-6_69f04ef06dade\" id=\"forminator-field-text-6_69f04ef06dade-label\" class=\"forminator-label\">Preferred Country <span class=\"forminator-required\">*<\/span><\/label><input type=\"text\" name=\"text-6\" value=\"\" placeholder=\"\" id=\"forminator-field-text-6_69f04ef06dade\" class=\"forminator-input forminator-name--field\" data-required=\"1\" aria-describedby=\"forminator-field-text-6_69f04ef06dade-description\" \/><span id=\"forminator-field-text-6_69f04ef06dade-description\" class=\"forminator-description\">your preferred country to join training<\/span><\/div><\/div><\/div><div class=\"forminator-row forminator-hidden\"><div id=\"hidden-1\" class=\"forminator-field-hidden  forminator-col-6 \"><input type=\"hidden\" id=\"hidden-1_69f04ef06dade\" name=\"hidden-1\" value=\"\" \/><\/div><div id=\"hidden-3\" class=\"forminator-field-hidden  forminator-col-6 \"><input type=\"hidden\" id=\"hidden-3_69f04ef06dade\" name=\"hidden-3\" value=\"\" \/><\/div><\/div><div class=\"forminator-row forminator-hidden\"><div id=\"hidden-2\" class=\"forminator-field-hidden  forminator-col-6 \"><input type=\"hidden\" id=\"hidden-2_69f04ef06dade\" name=\"hidden-2\" value=\"\" \/><\/div><div id=\"hidden-4\" class=\"forminator-field-hidden  forminator-col-6 \"><input type=\"hidden\" id=\"hidden-4_69f04ef06dade\" name=\"hidden-4\" value=\"\" \/><\/div><\/div><div class=\"forminator-row forminator-hidden\"><div id=\"hidden-10\" class=\"forminator-field-hidden  forminator-col-12 \"><input type=\"hidden\" id=\"hidden-10_69f04ef06dade\" name=\"hidden-10\" value=\"\" \/><\/div><\/div><div class=\"forminator-row forminator-hidden\"><div id=\"hidden-5\" class=\"forminator-field-hidden  forminator-col-12 \"><input type=\"hidden\" id=\"hidden-5_69f04ef06dade\" name=\"hidden-5\" value=\"\" \/><\/div><\/div><div class=\"forminator-row forminator-hidden\"><div id=\"hidden-6\" class=\"forminator-field-hidden  forminator-col-12 \"><input type=\"hidden\" id=\"hidden-6_69f04ef06dade\" name=\"hidden-6\" value=\"https:\/\/www.petrosync.com\/blog\/what-is-cased-hole-logging\/\" \/><\/div><\/div><div class=\"forminator-row forminator-hidden\"><div id=\"hidden-7\" class=\"forminator-field-hidden  forminator-col-12 \"><input type=\"hidden\" id=\"hidden-7_69f04ef06dade\" name=\"hidden-7\" value=\"216.73.217.35\" \/><\/div><\/div><div class=\"forminator-row forminator-hidden\"><div id=\"hidden-8\" class=\"forminator-field-hidden  forminator-col-12 \"><input type=\"hidden\" id=\"hidden-8_69f04ef06dade\" name=\"hidden-8\" value=\"04\/28\/2026\" \/><\/div><\/div><div class=\"forminator-row forminator-hidden\"><div id=\"hidden-9\" class=\"forminator-field-hidden  forminator-col-12 \"><input type=\"hidden\" id=\"hidden-9_69f04ef06dade\" name=\"hidden-9\" value=\"1:08:48 pm, GMT+0700\" \/><\/div><\/div><div class=\"forminator-row\"><div id=\"select-7\" class=\"forminator-field-select forminator-col forminator-col-12 \"><div class=\"forminator-field\"><label for=\"forminator-form-2174__field--select-7_69f04ef06dade\" id=\"forminator-form-2174__field--select-7_69f04ef06dade-label\" class=\"forminator-label\">Training Type <span class=\"forminator-required\">*<\/span><\/label><div class=\"forminator-multiselect\" aria-labelledby=\"forminator-form-2174__field--select-7_69f04ef06dade-label\" aria-describedby=\"forminator-form-2174__field--select-7_69f04ef06dade-description\"><label id=\"forminator-form-2174__field--select-7_69f04ef06dade-1-label\" for=\"forminator-form-2174__field--select-7_69f04ef06dade-1\" class=\"forminator-option forminator-is_checked\"><input type=\"checkbox\" name=\"select-7[]\" value=\"Offline\" id=\"forminator-form-2174__field--select-7_69f04ef06dade-1\" aria-labelledby=\"forminator-form-2174__field--select-7_69f04ef06dade-1-label\" data-calculation=\"0\"  data-hidden-behavior=\"zero\" checked=\"checked\" \/>Onsite<\/label><label id=\"forminator-form-2174__field--select-7_69f04ef06dade-2-label\" for=\"forminator-form-2174__field--select-7_69f04ef06dade-2\" class=\"forminator-option\"><input type=\"checkbox\" name=\"select-7[]\" value=\"Online\" id=\"forminator-form-2174__field--select-7_69f04ef06dade-2\" aria-labelledby=\"forminator-form-2174__field--select-7_69f04ef06dade-2-label\" data-calculation=\"0\"  data-hidden-behavior=\"zero\"  \/>Online<\/label><input type='hidden' name='select-7-multiselect-default-values' class='multiselect-default-values' value='{\"0\":\"Offline\"}' \/><\/div><span id=\"forminator-form-2174__field--select-7_69f04ef06dade-description\" class=\"forminator-description\">you can choose more than one.<\/span><\/div><\/div><\/div><div class=\"forminator-row\"><div id=\"select-1\" class=\"forminator-field-select forminator-col forminator-col-6 \"><div class=\"forminator-field\"><label for=\"forminator-form-2174__field--select-1_69f04ef06dade\" id=\"forminator-form-2174__field--select-1_69f04ef06dade-label\" class=\"forminator-label\">Training Category <span class=\"forminator-required\">*<\/span><\/label><select  id=\"forminator-form-2174__field--select-1_69f04ef06dade\" class=\"forminator-select--field forminator-select2 forminator-select2-multiple\" data-required=\"1\" name=\"select-1\" data-default-value=\"API\" data-hidden-behavior=\"zero\" data-placeholder=\"Please select an option\" data-search=\"false\" data-search-placeholder=\"Please select an option\" data-checkbox=\"false\" data-allow-clear=\"false\" aria-labelledby=\"forminator-form-2174__field--select-1_69f04ef06dade-label\"><option value=\"\"  >Please select an option<\/option><option value=\"API\" selected=\"selected\" data-calculation=\"0\">API<\/option><option value=\"ASME\"  data-calculation=\"0\">ASME<\/option><option value=\"Upstream\"  data-calculation=\"0\">Upstream<\/option><option value=\"Reliability\"  data-calculation=\"0\">Reliability<\/option><option value=\"Other\"  data-calculation=\"0\">Other<\/option><\/select><\/div><\/div><div id=\"select-2\" class=\"forminator-field-select forminator-col forminator-col-6 \"><div class=\"forminator-field\"><label for=\"forminator-form-2174__field--select-2_69f04ef06dade\" id=\"forminator-form-2174__field--select-2_69f04ef06dade-label\" class=\"forminator-label\">Training Topic <span class=\"forminator-required\">*<\/span><\/label><select  id=\"forminator-form-2174__field--select-2_69f04ef06dade\" class=\"forminator-select--field forminator-select2 forminator-select2-multiple\" data-required=\"1\" name=\"select-2\" data-default-value=\"API 510\" data-hidden-behavior=\"zero\" data-placeholder=\"Please select an option\" data-search=\"false\" data-search-placeholder=\"Please select an option\" data-checkbox=\"false\" data-allow-clear=\"false\" aria-labelledby=\"forminator-form-2174__field--select-2_69f04ef06dade-label\"><option value=\"\"  >Please select an option<\/option><option value=\"API 510\" selected=\"selected\" data-calculation=\"0\">API 510<\/option><option value=\"API-560\"  data-calculation=\"0\">API 560<\/option><option value=\"API 570\"  data-calculation=\"0\">API 570<\/option><option value=\"API 571\"  data-calculation=\"0\">API 571<\/option><option value=\"API 579\"  data-calculation=\"0\">API 579<\/option><option value=\"API 580 API 581\"  data-calculation=\"0\">API 580 - API 581<\/option><option value=\"API 653\"  data-calculation=\"0\">API 653<\/option><option value=\"API 936\"  data-calculation=\"0\">API 936<\/option><\/select><\/div><\/div><\/div><div class=\"forminator-row\"><div id=\"select-4\" class=\"forminator-field-select forminator-col forminator-col-12 \"><div class=\"forminator-field\"><label for=\"forminator-form-2174__field--select-4_69f04ef06dade\" id=\"forminator-form-2174__field--select-4_69f04ef06dade-label\" class=\"forminator-label\">Training Topic <span class=\"forminator-required\">*<\/span><\/label><select  id=\"forminator-form-2174__field--select-4_69f04ef06dade\" class=\"forminator-select--field forminator-select2 forminator-select2-multiple\" data-required=\"1\" name=\"select-4\" data-default-value=\"ASME B31.3\" data-hidden-behavior=\"zero\" data-placeholder=\"Please select an option\" data-search=\"false\" data-search-placeholder=\"Please select an option\" data-checkbox=\"false\" data-allow-clear=\"false\" aria-labelledby=\"forminator-form-2174__field--select-4_69f04ef06dade-label\"><option value=\"\"  >Please select an option<\/option><option value=\"ASME I\"  data-calculation=\"0\">ASME I<\/option><option value=\"ASME VIII\"  data-calculation=\"0\">ASME VIII<\/option><option value=\"ASME B31.3\" selected=\"selected\" data-calculation=\"0\">ASME B31.3<\/option><option value=\"ASME PCC-2\"  data-calculation=\"0\">ASME PCC-2<\/option><option value=\"Shell &amp; Tube Heat Exchangers\"  data-calculation=\"0\">Shell &amp; Tube Heat Exchangers<\/option><\/select><\/div><\/div><\/div><div class=\"forminator-row\"><div id=\"select-3\" class=\"forminator-field-select forminator-col forminator-col-12 \"><div class=\"forminator-field\"><label for=\"forminator-form-2174__field--select-3_69f04ef06dade\" id=\"forminator-form-2174__field--select-3_69f04ef06dade-label\" class=\"forminator-label\">Training Topic <span class=\"forminator-required\">*<\/span><\/label><select  id=\"forminator-form-2174__field--select-3_69f04ef06dade\" class=\"forminator-select--field forminator-select2 forminator-select2-multiple\" data-required=\"1\" name=\"select-3\" data-default-value=\"Applied Drilling Well Engineering\" data-hidden-behavior=\"zero\" data-placeholder=\"Please select an option\" data-search=\"false\" data-search-placeholder=\"Please select an option\" data-checkbox=\"false\" data-allow-clear=\"false\" aria-labelledby=\"forminator-form-2174__field--select-3_69f04ef06dade-label\"><option value=\"\"  >Please select an option<\/option><option value=\"Applied Drilling Well Engineering\" selected=\"selected\" data-calculation=\"0\">Applied Drilling Well Engineering<\/option><option value=\"Advanced Well Log Analysis Interpretation\"  data-calculation=\"0\">Advanced Well Log Analysis Interpretation<\/option><option value=\"Advanced HPHT Well Engineering\"  data-calculation=\"0\">Advanced HPHT Well Engineering<\/option><option value=\"Artificial Lift Method\"  data-calculation=\"0\">Artificial Lift Method<\/option><option value=\"Coiled Tubing\"  data-calculation=\"0\">Coiled Tubing<\/option><option value=\"Stuck Pipe Prevention &amp; Fishing Operation\"  data-calculation=\"0\">Stuck Pipe Prevention &amp; Fishing Operation<\/option><option value=\"Oil Process Facilities\"  data-calculation=\"0\">Oil Process Facilities<\/option><option value=\"Upstream Petroleum Economics and Fiscal Analysis\"  data-calculation=\"0\">Upstream Petroleum Economics and Fiscal Analysis<\/option><option value=\"Water Flooding Management\"  data-calculation=\"0\">Water Flooding Management<\/option><option value=\"Well Completion Workover\"  data-calculation=\"0\">Well Completion Workover<\/option><option value=\"Well Integrity Cased Hole Logging\"  data-calculation=\"0\">Well Integrity Cased Hole Logging<\/option><option value=\"Wellbore Treatment\"  data-calculation=\"0\">Wellbore Treatment<\/option><\/select><\/div><\/div><\/div><div class=\"forminator-row\"><div id=\"select-5\" class=\"forminator-field-select forminator-col forminator-col-12 \"><div class=\"forminator-field\"><label for=\"forminator-form-2174__field--select-5_69f04ef06dade\" id=\"forminator-form-2174__field--select-5_69f04ef06dade-label\" class=\"forminator-label\">Training Topic <span class=\"forminator-required\">*<\/span><\/label><select  id=\"forminator-form-2174__field--select-5_69f04ef06dade\" class=\"forminator-select--field forminator-select2 forminator-select2-multiple\" data-required=\"1\" name=\"select-5\" data-default-value=\"CMRP\" data-hidden-behavior=\"zero\" data-placeholder=\"Please select an option\" data-search=\"false\" data-search-placeholder=\"Please select an option\" data-checkbox=\"false\" data-allow-clear=\"false\" aria-labelledby=\"forminator-form-2174__field--select-5_69f04ef06dade-label\"><option value=\"\"  >Please select an option<\/option><option value=\"CMRP\" selected=\"selected\" data-calculation=\"0\">CMRP<\/option><option value=\"CRE (Certified Reliability Engineer)\"  data-calculation=\"0\">CRE (Certified Reliability Engineer)<\/option><option value=\"ISO 55000\"  data-calculation=\"0\">ISO 55000<\/option><option value=\"Maintenance Planning Scheduling\"  data-calculation=\"0\">Maintenance Planning Scheduling<\/option><option value=\"RCA (Root Cause Analysis)\"  data-calculation=\"0\">RCA (Root Cause Analysis)<\/option><option value=\"RCM (Applied Reliability Centered Maintenance)\"  data-calculation=\"0\">RCM (Applied Reliability Centered Maintenance)<\/option><\/select><\/div><\/div><\/div><div class=\"forminator-row\"><div id=\"text-5\" class=\"forminator-field-text forminator-col forminator-col-12 \"><div class=\"forminator-field\"><label for=\"forminator-field-text-5_69f04ef06dade\" id=\"forminator-field-text-5_69f04ef06dade-label\" class=\"forminator-label\">Tell us what training topic you are interested to take.<\/label><input type=\"text\" name=\"text-5\" value=\"\" placeholder=\"Input your training topic\" id=\"forminator-field-text-5_69f04ef06dade\" class=\"forminator-input forminator-name--field\" data-required=\"\" \/><\/div><\/div><\/div><div class=\"forminator-row\"><div id=\"captcha-1\" class=\"forminator-field-captcha forminator-col forminator-col-12 \"><div class=\"forminator-captcha-left forminator-g-recaptcha\" data-theme=\"light\"  data-sitekey=\"6Lf2oJ4pAAAAAFDl3cVt_R3wQ4Ztl0KF3g8YG1La\" data-size=\"normal\"><\/div> <\/div><\/div><input type=\"hidden\" name=\"referer_url\" value=\"\" \/><div class=\"forminator-row forminator-row-last\"><div class=\"forminator-col\"><div class=\"forminator-field\"><button class=\"forminator-button forminator-button-submit\">Get Details<\/button><\/div><\/div><\/div><input type=\"hidden\" id=\"forminator_nonce\" name=\"forminator_nonce\" value=\"fc78448620\" \/><input type=\"hidden\" name=\"_wp_http_referer\" value=\"\/blog\/wp-json\/wp\/v2\/posts\/3290\" \/><input type=\"hidden\" name=\"form_id\" value=\"2174\"><input type=\"hidden\" name=\"page_id\" value=\"3290\"><input type=\"hidden\" name=\"form_type\" value=\"default\"><input type=\"hidden\" name=\"current_url\" value=\"https:\/\/www.petrosync.com\/blog\/what-is-cased-hole-logging\/\"><input type=\"hidden\" name=\"render_id\" value=\"0\"><input type=\"hidden\" name=\"action\" value=\"forminator_submit_form_custom-forms\"><\/form><\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In the world of oil and gas, evaluating reservoirs is vital for success. Cased hole logging is a critical tool in this process, helping us understand what&#8217;s beneath the surface. Before we dive into the details of cased hole logging and its role in reservoir evaluation, let&#8217;s first grasp why it&#8217;s so important. This introduction<\/p>\n","protected":false},"author":2,"featured_media":3292,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":{"0":"post-3290","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-drilling-and-well-engineering"},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v25.3 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Cased Hole Logging as The Key Role in Reservoir Evaluation<\/title>\n<meta name=\"description\" content=\"A cased hole log involves retrieving logging measurements through the well casing, or the metal piping that is inserted into the well.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.petrosync.com\/blog\/what-is-cased-hole-logging\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Cased Hole Logging as The Key Role in Reservoir Evaluation\" \/>\n<meta property=\"og:description\" content=\"A cased hole log involves retrieving logging measurements through the well casing, or the metal piping that is inserted into the well.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.petrosync.com\/blog\/what-is-cased-hole-logging\/\" \/>\n<meta property=\"og:site_name\" content=\"PetroSync Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/wwwfacebook.com\/PetroSync\/\" \/>\n<meta property=\"article:published_time\" content=\"2024-02-26T09:34:57+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-07-07T07:59:32+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.petrosync.com\/blog\/wp-content\/uploads\/2024\/02\/Open-and-cased-hole-logs-for-three-wells-B-C-and-D-drilled-through.png\" \/>\n\t<meta property=\"og:image:width\" content=\"850\" \/>\n\t<meta property=\"og:image:height\" content=\"540\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Syafina Firdaus\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Syafina Firdaus\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/what-is-cased-hole-logging\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/what-is-cased-hole-logging\\\/\"},\"author\":{\"name\":\"Syafina Firdaus\",\"@id\":\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/#\\\/schema\\\/person\\\/96b7f0717c58cbce8784f857b42879f2\"},\"headline\":\"Cased Hole Logging as The Key Role in Reservoir Evaluation\",\"datePublished\":\"2024-02-26T09:34:57+00:00\",\"dateModified\":\"2025-07-07T07:59:32+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/what-is-cased-hole-logging\\\/\"},\"wordCount\":1069,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/what-is-cased-hole-logging\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Open-and-cased-hole-logs-for-three-wells-B-C-and-D-drilled-through.png\",\"articleSection\":[\"Drilling and Well Engineering\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/what-is-cased-hole-logging\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/what-is-cased-hole-logging\\\/\",\"url\":\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/what-is-cased-hole-logging\\\/\",\"name\":\"Cased Hole Logging as The Key Role in Reservoir Evaluation\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/what-is-cased-hole-logging\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/what-is-cased-hole-logging\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Open-and-cased-hole-logs-for-three-wells-B-C-and-D-drilled-through.png\",\"datePublished\":\"2024-02-26T09:34:57+00:00\",\"dateModified\":\"2025-07-07T07:59:32+00:00\",\"description\":\"A cased hole log involves retrieving logging measurements through the well casing, or the metal piping that is inserted into the well.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/what-is-cased-hole-logging\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/what-is-cased-hole-logging\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/what-is-cased-hole-logging\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Open-and-cased-hole-logs-for-three-wells-B-C-and-D-drilled-through.png\",\"contentUrl\":\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Open-and-cased-hole-logs-for-three-wells-B-C-and-D-drilled-through.png\",\"width\":850,\"height\":540,\"caption\":\"cased hole logging\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/what-is-cased-hole-logging\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Cased Hole Logging as The Key Role in Reservoir Evaluation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/\",\"name\":\"PetroSync Blog\",\"description\":\"Oil and Gas Training, Course, and Workshop\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/#organization\",\"name\":\"PetroSync\",\"url\":\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/Petrosync-Oil-and-Gas-petrochemical-and-energy-training-2-jpeg.webp\",\"contentUrl\":\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/Petrosync-Oil-and-Gas-petrochemical-and-energy-training-2-jpeg.webp\",\"width\":142,\"height\":142,\"caption\":\"PetroSync\"},\"image\":{\"@id\":\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/wwwfacebook.com\\\/PetroSync\\\/\",\"https:\\\/\\\/www.instagram.com\\\/petrosync\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/in\\\/petrosync-b1159089\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/petrosync\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/#\\\/schema\\\/person\\\/96b7f0717c58cbce8784f857b42879f2\",\"name\":\"Syafina Firdaus\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fa0380838f53f036e661c050962a40abacdddc6f1950178ae9ba30d7052b5a8b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fa0380838f53f036e661c050962a40abacdddc6f1950178ae9ba30d7052b5a8b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fa0380838f53f036e661c050962a40abacdddc6f1950178ae9ba30d7052b5a8b?s=96&d=mm&r=g\",\"caption\":\"Syafina Firdaus\"},\"description\":\"SEO specialist by day, fact-checker by night. An avid reader and content writer dedicated to delivering accurate and engaging articles through research and credible sources.\",\"gender\":\"Female\",\"knowsLanguage\":[\"English\",\"Indonesia\"],\"jobTitle\":\"SEO Specialist\",\"worksFor\":\"Syafina Firdaus\",\"url\":\"https:\\\/\\\/www.petrosync.com\\\/blog\\\/author\\\/syafinaf\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Cased Hole Logging as The Key Role in Reservoir Evaluation","description":"A cased hole log involves retrieving logging measurements through the well casing, or the metal piping that is inserted into the well.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.petrosync.com\/blog\/what-is-cased-hole-logging\/","og_locale":"en_US","og_type":"article","og_title":"Cased Hole Logging as The Key Role in Reservoir Evaluation","og_description":"A cased hole log involves retrieving logging measurements through the well casing, or the metal piping that is inserted into the well.","og_url":"https:\/\/www.petrosync.com\/blog\/what-is-cased-hole-logging\/","og_site_name":"PetroSync Blog","article_publisher":"https:\/\/wwwfacebook.com\/PetroSync\/","article_published_time":"2024-02-26T09:34:57+00:00","article_modified_time":"2025-07-07T07:59:32+00:00","og_image":[{"width":850,"height":540,"url":"https:\/\/www.petrosync.com\/blog\/wp-content\/uploads\/2024\/02\/Open-and-cased-hole-logs-for-three-wells-B-C-and-D-drilled-through.png","type":"image\/png"}],"author":"Syafina Firdaus","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Syafina Firdaus","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.petrosync.com\/blog\/what-is-cased-hole-logging\/#article","isPartOf":{"@id":"https:\/\/www.petrosync.com\/blog\/what-is-cased-hole-logging\/"},"author":{"name":"Syafina Firdaus","@id":"https:\/\/www.petrosync.com\/blog\/#\/schema\/person\/96b7f0717c58cbce8784f857b42879f2"},"headline":"Cased Hole Logging as The Key Role in Reservoir Evaluation","datePublished":"2024-02-26T09:34:57+00:00","dateModified":"2025-07-07T07:59:32+00:00","mainEntityOfPage":{"@id":"https:\/\/www.petrosync.com\/blog\/what-is-cased-hole-logging\/"},"wordCount":1069,"commentCount":0,"publisher":{"@id":"https:\/\/www.petrosync.com\/blog\/#organization"},"image":{"@id":"https:\/\/www.petrosync.com\/blog\/what-is-cased-hole-logging\/#primaryimage"},"thumbnailUrl":"https:\/\/www.petrosync.com\/blog\/wp-content\/uploads\/2024\/02\/Open-and-cased-hole-logs-for-three-wells-B-C-and-D-drilled-through.png","articleSection":["Drilling and Well Engineering"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.petrosync.com\/blog\/what-is-cased-hole-logging\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.petrosync.com\/blog\/what-is-cased-hole-logging\/","url":"https:\/\/www.petrosync.com\/blog\/what-is-cased-hole-logging\/","name":"Cased Hole Logging as The Key Role in Reservoir Evaluation","isPartOf":{"@id":"https:\/\/www.petrosync.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.petrosync.com\/blog\/what-is-cased-hole-logging\/#primaryimage"},"image":{"@id":"https:\/\/www.petrosync.com\/blog\/what-is-cased-hole-logging\/#primaryimage"},"thumbnailUrl":"https:\/\/www.petrosync.com\/blog\/wp-content\/uploads\/2024\/02\/Open-and-cased-hole-logs-for-three-wells-B-C-and-D-drilled-through.png","datePublished":"2024-02-26T09:34:57+00:00","dateModified":"2025-07-07T07:59:32+00:00","description":"A cased hole log involves retrieving logging measurements through the well casing, or the metal piping that is inserted into the well.","breadcrumb":{"@id":"https:\/\/www.petrosync.com\/blog\/what-is-cased-hole-logging\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.petrosync.com\/blog\/what-is-cased-hole-logging\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.petrosync.com\/blog\/what-is-cased-hole-logging\/#primaryimage","url":"https:\/\/www.petrosync.com\/blog\/wp-content\/uploads\/2024\/02\/Open-and-cased-hole-logs-for-three-wells-B-C-and-D-drilled-through.png","contentUrl":"https:\/\/www.petrosync.com\/blog\/wp-content\/uploads\/2024\/02\/Open-and-cased-hole-logs-for-three-wells-B-C-and-D-drilled-through.png","width":850,"height":540,"caption":"cased hole logging"},{"@type":"BreadcrumbList","@id":"https:\/\/www.petrosync.com\/blog\/what-is-cased-hole-logging\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.petrosync.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Cased Hole Logging as The Key Role in Reservoir Evaluation"}]},{"@type":"WebSite","@id":"https:\/\/www.petrosync.com\/blog\/#website","url":"https:\/\/www.petrosync.com\/blog\/","name":"PetroSync Blog","description":"Oil and Gas Training, Course, and Workshop","publisher":{"@id":"https:\/\/www.petrosync.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.petrosync.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.petrosync.com\/blog\/#organization","name":"PetroSync","url":"https:\/\/www.petrosync.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.petrosync.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.petrosync.com\/blog\/wp-content\/uploads\/2022\/04\/Petrosync-Oil-and-Gas-petrochemical-and-energy-training-2-jpeg.webp","contentUrl":"https:\/\/www.petrosync.com\/blog\/wp-content\/uploads\/2022\/04\/Petrosync-Oil-and-Gas-petrochemical-and-energy-training-2-jpeg.webp","width":142,"height":142,"caption":"PetroSync"},"image":{"@id":"https:\/\/www.petrosync.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/wwwfacebook.com\/PetroSync\/","https:\/\/www.instagram.com\/petrosync\/","https:\/\/www.linkedin.com\/in\/petrosync-b1159089","https:\/\/www.linkedin.com\/company\/petrosync\/"]},{"@type":"Person","@id":"https:\/\/www.petrosync.com\/blog\/#\/schema\/person\/96b7f0717c58cbce8784f857b42879f2","name":"Syafina Firdaus","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/fa0380838f53f036e661c050962a40abacdddc6f1950178ae9ba30d7052b5a8b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/fa0380838f53f036e661c050962a40abacdddc6f1950178ae9ba30d7052b5a8b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/fa0380838f53f036e661c050962a40abacdddc6f1950178ae9ba30d7052b5a8b?s=96&d=mm&r=g","caption":"Syafina Firdaus"},"description":"SEO specialist by day, fact-checker by night. An avid reader and content writer dedicated to delivering accurate and engaging articles through research and credible sources.","gender":"Female","knowsLanguage":["English","Indonesia"],"jobTitle":"SEO Specialist","worksFor":"Syafina Firdaus","url":"https:\/\/www.petrosync.com\/blog\/author\/syafinaf\/"}]}},"_links":{"self":[{"href":"https:\/\/www.petrosync.com\/blog\/wp-json\/wp\/v2\/posts\/3290","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.petrosync.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.petrosync.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.petrosync.com\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.petrosync.com\/blog\/wp-json\/wp\/v2\/comments?post=3290"}],"version-history":[{"count":2,"href":"https:\/\/www.petrosync.com\/blog\/wp-json\/wp\/v2\/posts\/3290\/revisions"}],"predecessor-version":[{"id":4875,"href":"https:\/\/www.petrosync.com\/blog\/wp-json\/wp\/v2\/posts\/3290\/revisions\/4875"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.petrosync.com\/blog\/wp-json\/wp\/v2\/media\/3292"}],"wp:attachment":[{"href":"https:\/\/www.petrosync.com\/blog\/wp-json\/wp\/v2\/media?parent=3290"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.petrosync.com\/blog\/wp-json\/wp\/v2\/categories?post=3290"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.petrosync.com\/blog\/wp-json\/wp\/v2\/tags?post=3290"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}