Practical Aspects of CO2-EOR Project Development

CO2-Enhanced oil recovery (EOR) projects involve significant risks due to additional capital and operating costs for purchasing and recycling CO2, new wells…

Register Training
Quick Inquiry
Level
Intermediate
Type
Course
Practical Aspects of CO2-EOR Project Development

Trusted by Leading Companies

Our training programs are promoted to engineers, supervisors, and technical teams across the globe, supporting their continuous development and operational competency.

About Training

CO2-Enhanced oil recovery (EOR) projects involve significant risks due to additional capital and operating costs for purchasing and recycling CO2, new wells, equipment, and fluid handling/treatment to mitigate corrosion/ hydrate issues. It follows that they be optimally screened, designed and operated to reduce the overall risks.

This five-day course discusses various steps involved in development of an EOR project. These steps include screening, laboratory and field testing, simulation, design, interpretation and follow-up of CO2-EOR field pilots including appropriate monitoring/ surveillance, installation of CO2 recycling (separation, dehydration & compression) facilities and critical reviews of unresolved issues in the proposed projects.

Training Objectives

  • Overview of various steps involved in CO2-EOR project development
  • In-depth discussion of screening of prospects for different CO2-EOR processes
  • Field tests and laboratory investigations as aids in developing a CO2-EOR project
  • Field piloting of proposed CO2-EOR schemes and interpretations
  • Monitoring and surveillance
  • Overall scrutiny of CO2-EOR schemes

Audiences

Reservoir engineers, EOR engineers, production engineers, petroleum engineers, geologist, project engineers, project managers and anyone else who desire to obtain a comprehensive knowledge of CO2-EOR Projects.

Instructor

Ashok Singhal

Ashok Singhal is a Principal Consultant at Premier Reservoir Engineering Services Ltd, a consulting firm that specializes in assisting in the screening and development of optimal technology strategies to exploit hydrocarbon resources including: oil sands, heavy oil, conventional and tight oil. Ashok works with a network of consultants to deliver client services. Ashok has over thirty years of experience as a supervisor, engineer, consultant and research scientist in the oil industry and research organizations, where he worked on EOR screening, project development, implementation and evaluation of various recovery schemes to exploit existing oil and gas resources, or to assure that tight oil resources would become commercially viable in the medium to long terms. Ashok has participated in screening, conceptualizing, feasibility evaluation, planning, implementation, or evaluation of several Improved or Enhanced Oil Recovery (IOR/ EOR) pilots in the field.

Daily Aims

  • Phase Behaviour, Miscibility, Oil-Reservoir Rock Interactions
  • Displacement and Sweep Efficiencies
  • Conceptualizing CO2 Assisted Enhanced Oil Recovery Schemes Reservoir Characterization for CO2-EOR
  • Laboratory Testing and Implication of Results
  • Screening for Gas Injection based EOR schemes
  • Practical Considerations and Economics
  • Class Problem-1
  • Screening for Miscible and Immiscible CO2-EOR
  • Class Problem-2
  • Case Studies of Horizontal Miscible CO2-Floods
  • Case Studies of Vertical CO2-Floods
  • Case Studies of CO2 Huff ‘n Puff
  • Field Testing and implication of Results
  • Kinds of EOR Pilots
  • Setting Objectives
  • Conceptualizing the Pilot
  • Pilot Site Selection
  • Injectivity and pressure testing
  • Pre-Pilot Preparatory Work
  • Identifying Success Indicators and Interpretation Strategy
  • Critical requirements for Pilot Operations
  • Specifying requirements for Facilities
  • Monitoring and Surveillance Plans
  • Operating Guidelines/Project Implementation
  • Tracking Progress of the Pilot/ Scaling up Pilot Results to a Larger Area
  • CO2-EOR Project Monitoring: Critical Aspects
  • Water Flood Surveillance Practices
  • CO2-EOR Project Surveillance
  • Monitoring of Volumetric Sweep
  • Monitoring of Corrosion and Scales
  • Interpreting Viability of CO2-EOR from Monitored Data
  • Identification of Outstanding Challenges during Commercial Phase
  • Risk Mitigation Plans
  • Performance Predictions by Simulation and Analogy
  • Designing and Planning Aspects
  • Sub-Surface Facilities and Operational Considerations
  • CO2-EOR Cases Main Challenges and Key Unknowns/ Uncertainties

Training Schedule

No upcoming session is scheduled yet. Send a quick inquiry and we will let you know the next date.

Why Choose This Training

Credibility

Align with API/ASME standards. Trusted by major operators.

Expert Instructors

Led by industry veterans with real field experience.

Real Case Studies

Practical application of concepts through real world scenarios.

Practical Skills

Hands on calculations and decision making for FFS outcomes.

Trusted by Operators

Delivered to Aramco, ADNOC, SABIC, and other major operators.

Global Training Standard

Recognized across major industries by PetroSync's proven approach.

Professional Training Aligned with Industry Standards

Practical, industry ready training designed for real work environments

Limited seats available

Frequently Asked Questions

PetroSync offers various training programs for the oil, gas, petrochemical, and energy industries, such as API, ASME, Reliability, Drilling & Well Engineering.
PetroSync provides both online and in-person training options to accommodate participants' preferences and needs.
The duration of each program varies, typically ranging from 3 to 5 days, depending on the complexity of the topic.
Yes, most PetroSync courses include practical exercises, case studies, and real-world applications to enhance learning outcomes.
Yes, PetroSync offers foundational courses designed for beginners, as well as advanced programs for experienced professionals.