Well Completion and Workover (WCW)
5-day training in well completion and workover. Dive deep into completion types, perforation strategies & surface installation. Indonesia Malaysia based course
Level
Intermediate
Type
Facetoface
Trusted by Leading Companies
Our training programs are promoted to engineers, supervisors, and technical teams across the globe, supporting their continuous development and operational competency.
About Training
This 5-day course will cover successful well completion and workover practices. It is a practical oriented course designed to bridge the knowledge gap in the area well completion and workover designs and operations.
Well completion is considered to be one of the most critical practices for reservoir exploitation and management. During this process, the responsible personnel is tasked to optimally design and install a system that can deliver its full potential to optimize oil gas and production, without compromising safety and reliability.
During the field life cycle, some reservoirs undergo some physical and chemical changes. This leads to loss of revenue as the wells are no longer operating at their optimal conditions. Hence, a workover/well intervention may be required to safely and efficiently restore the wells back to production. This presents a lot of challenges due to the different reservoir fluids, various operating conditions, and different operating environments.
The course possesses the following futures:
- It is the first of its kind in the industry.
- It is loaded with practical examples, case studies, and industrial applications taken from:
- Different operating environment (land, swamp, and offshore including deep-water)
- Different well conditions: High-Pressure High-Temperature, sour gas, and sweet gas, etc.
- Tropical and arctic (temperate) climates
- It provides practical exercises, and delegates will be followed up to ensure they can handle all the calculations, without difficulties.
- Focuses on different technological innovations to optimize reservoir drilling and completion practices, to improve well productivity.
- Sustainable and responsible oil and gas field development and production amid energy transition.
- It could be designed to meet the need of the clients on specific topics of interest.
- Team learning. A group completion design project accomplishes the course. All the elements of the course will help you and your team to handle the project challenge.
- Towards the end of the course, the groups formed in the class will present their completion design project for discussions/reviews.
- Delegates are allowed to come with their projects of interest, which they could substitute for the class field project design work but must be presented for discussions/reviews
Training Objectives
What is Well Completion and Workover training course objective?
The course is designed to focus on practical applications regarding:
1. Identify and understand the parameters that influence the selection and design of completion components.2. Integrate the importance of completion process to future production.
3. Deliver techniques to select the best tubing size and best materials for well completion.
4. Gain practical methods to design, plan and install safe and efficient well completion and workover.
5. Manage well environments with extreme reservoir conditions (pressure, temperature, etc.)
6. Bridge the importance of well design in relation to the ability to carry out well intervention.
7. Explore new technological developments in well completions and workovers.
8. Plan an appropriate intervention and workover strategy to maintain or increase the field production.
9. Gain how to navigate sustainable and responsible oil and gas field development and production amid energy transition.
Audiences
Who should join Well Completion & Workover training course by PetroSync?
The course is designed for, but not limited to:
- Completion Engineer /Supervisors /Superintendent
- Completions Team Led /Manager
- Well Services /Intervention Engineer /Supervisors
- Workover Engineer /Supervisors
- Petroleum Engineer
- Reservoir Engineer
- Drilling Engineer/Superintendent /Site Manager
- Oil and Gas industry Drilling/Completion/Intervention Service providers
Instructor
ME
Michael Etuhoko
Michael (Mike) Etuhoko is a well known consultant and founder of Protekz Inc. Canada, an independent well and production engineering consultancy company. He has over 22 years of experience in the Oil & Gas industry. He has led major projects & trainings for major companies in Europe, North America, Africa, Central Asia, and Far East Asia. Mike currently consults worldwide in the area of Well Completion, Workover and Well Services, Sand Control, and Formation Damage Prevention and Treatments. Before working as a consultant, he has served several years in Shell and Total E&P , which has equipped him with a solid foundation in well completion and workover practices.
His Current and Recent Assignments Include the Following:
- Lead Completions & Intervention for Karachaganak Field, Kazakhstan
Completion & Intervention for Field with Characteristics: Deep wells (± 6200m TVD on the average), light oil/condensate and gas, High GOR, H2S > 7%, CO2 > 6%, low porosity, low permeability and HPHT reservoir environment
- Subsea Intervention/Workover/Completion for Korean National Oil Company
Diagnose and restore Donghae 1-4P Sub-sea well back to production
- Completions, Sand Control, & Well Testing (Deepwater Explroation Asset) for BG Nigeria
Responsible for “Well Completion and Testing” operations in deepwater exploration campaign
- Well Productivity for Total E&P
Scales Squeeze treatment for Dunbar, Alwyn, Otter and Elgin/Franklin fields; Fracturing design and operations in HPHT wells; Sand Control in HPHT wells, Water shut-off in HPHT wells
Mike has presented for several international conferences including Offshore Technology Conference, SPE Asia Pacific Oil & Gas Conference, and SPE Annual Technical Conference Exhibition. He has also authored SPE papers on “Monobore Completion Using Interventionless Technology” and “Open Hole Multistage Fracturing Completion in Carbonate Reservoir.”
Daily Aims
- Introduction
- Introduction of individual, professional background, etc.
- Aim / Objective of the course
- Individual expectation from the course
- Safety Alert
- Starter Quiz & Review
- Introduction to Completion design
- Definition of well completion
- Oil and gas project life cycle
- Types of well completion
- Completion planning
- Work flow for successful well completion & workover
- Integrated approach to well completion
- Concept of Darcy’s Law & SKIN
- Reservoir Completion:
- Well Performance
- Perforations
- Well Stimulation
- Stimulation of Sandstone reservoir
- Stimulation of Carbonate reservoir
- Introduction to completion design project
- Reservoir Completion: Hydraulic Fracturing
- Class exercise: The objectives of the class exercise on hydraulic fracturing are as follows:
- Calculations on Fold of Increase (FOI) as a screening tool to select wells for hydraulic fracturing candidate.
- Calculations to compare acid frac versus propped frac in a carbonate reservoir
- Sand control stimulation techniques:
- Causes of sand production
- Sand control design concepts
- Class exercise: The objectives of the class exercise on sand control are as follows:
- Perforation gun selection
- Perforation cleaning
- Sand control design selection
- Gravel size selection
- Screen size selection
- Tubing Performance
- Artificial Lift Methods
- Production Chemistry
- Problem Identification
- Class exercise: The objectives of the class exercise on well problem identification are as follows:
- Calculations on the effect of formation damage on well production
- Calculations on flow efficiency
- Use of production history to assess formation damage
- Stimulation well candidate selection
- Group work: Completion design project
- Tubing Stress Analysis
- Purpose of Stress Analysis
- Stress Loads: stress/strain, axial loads, burst/
- collapse and tri-axial analysis
- Safety Factors and Design Factors
- Load Cases
- Completion Equipment and Connections
- Class exercise: The objectives of the class exercise on tubing stress analysis are as follows:
- Basic TSA calculations including weight in air, buoyancy force, axial force due to bending, safety factors, collapse loads, tensile yield, internal yield pressure, etc.
- Tubing movements and tension calculations during well stimulation
- Materials Selection:
- Metallurgy
- Corrosion triangle
- Types of corrosion:
- Metallurgy
- Corrosion triangle
- Types of corrosion:
- Sour corrosion (stress corrosion cracking, sulphide stress cracking, etc.)
- Sweet corrosion,
- Ggalvanic corrosion
- Erosion-corrosion, etc.,
- Corrosion prevention methods
- Elastomers and Plastics
- Protective Coatings
- Material selections for all types of wells: Sour, sweet, HPHT wells, etc
- NACE/ISO on material selection
- Completion Components
- OCTG selections
- Completion components and selections: Christmas tree, tubing hangers, downhole safety valve, packers, expansion devices, nipples, downhole gauges, etc.
- Group work: Completion design project
- Completion operation base preparation
- Equipment purchasing, manufacturing and factory acceptance
- Service contracts
- Equipment preparation
- Technical program
- Rig preparation and completion installation process
- Operation planning
- Equipment shipping/transportation
- Equipment reception
- Pre-job meeting
- Casing cleaning operation
- Running in hole the completion equipment
- Well clean-up
- Reporting
- After-action review
- Emerging Techniques
- Fiber Optics: Distributed Temperature System (DTS), Pressure/ temperature (P/T), etc
- Intervention-less packers (Hydrostatic packers, swelling packers, etc.)
- In-situ self generating weak acid
- Expandable tubulars
- Expandable Sand Screens (ESS)
- Sand Control in High angle and long interval: Alternate path technology (SHUTS, CAPS, etc.)
- Formation Isolation Valves (FIV)
- Intelligent & Smart Well
- Completion: Interval Control Valves (ICV)
- Underbalanced Drilling & Completion
- Cased Hole Circulation Drilling & completion
- Multistage Fracturing
- Group Work: Well completion design
- Well Control:
- Well control Equipment:
- Blowout preventer system requirements
- Choke Manifold
- Circulating System
- Kicks and its causes
- Well Killing Operations:
- Forward circulation
- Reverse circulation
- Bullheading
- Lubricate and Bleed
- Well control Equipment:
- Class exercises on well control
- Workover Operations:
- Workover definition and description
- Workover Types:
- Safety Workover (SWO)
- Long term suspension (LTS)
- Plug and Abandonment (P&A)
- Production enhancement (PE)
- Workover Feasibility Studies
- Group presentation / General Review of the Well completion Design Project
- Wrap up
Training Schedule
| Code | Start Date | End Date | Locations | Cost | Instructor |
|---|---|---|---|---|---|
| PST0192-201401 | 25 Aug, 2014 | 29 Aug, 2014 | Kuala Lumpur, Malaysia | SGD 5995 | Michael Etuhoko, P.Eng., PMP |
| PST0192-201501 | 01 Jun, 2015 | 05 Jun, 2015 | Bali, Indonesia | SGD 5995 | Michael Etuhoko, P.Eng., PMP |
| PST0192-202401 | 24 Jun, 2024 | 28 Jun, 2024 | Kuala Lumpur, Malaysia | USD 4250 | Michael Etuhoko, P.Eng., PMP |
| PST0192-202402 | 09 Dec, 2024 | 13 Dec, 2024 | Bali, Indonesia | USD 4450 | Michael Etuhoko, P.Eng., PMP |
| PST0192-202501 | 08 Dec, 2025 | 12 Dec, 2025 | Kuala Lumpur, Malaysia | USD 4250 | Michael Etuhoko, P.Eng., PMP |
Why Choose This Training
Credibility
Align with API/ASME standards. Trusted by major operators.
Expert Instructors
Led by industry veterans with real field experience.
Real Case Studies
Practical application of concepts through real world scenarios.
Practical Skills
Hands on calculations and decision making for FFS outcomes.
Trusted by Operators
Delivered to Aramco, ADNOC, SABIC, and other major operators.
Global Training Standard
Recognized across major industries by PetroSync's proven approach.
Professional Training Aligned with Industry Standards
Practical, industry ready training designed for real work environments
Limited seats available
Frequently Asked Questions
-
Direct Transfer
PetroSync Global Pte Ltd Bank Details:
- Account Name: PetroSync Global Pte Ltd
- Bank Name: DBS Bank Ltd
- Bank Code: 7171
- Bank Swift Code: DBSSSGSGXXX
- Branch Code: 288
- Account No: 0288-002682-01-6-022 (USD)
- Bank Address: 12 Marina Boulevard, Level 3, Marina Bay Financial Centre Tower 3, Singapore 018982
-
Terms & Conditions:
- For payment via direct telegraphic transfer, clients must bear both local and overseas bank charges.
-
Credit Card:
Terms & Conditions:
- A 4% credit card processing fee applies for credit card payments.
- Delegates who cancel after the training has been officially confirmed via email are required to pay the full course fee, and no refunds will be granted. However, you may substitute delegates at any time as long as reasonable advance notice is given to PetroSync.
- If PetroSync cancels, postpones, changes the trainer, or alters the training location (classroom/virtual) for any reason, and the delegate is unable or unwilling to attend on the rescheduled date, a 100% credit voucher of the paid contract fee will be issued. This credit voucher can be used for another PetroSync training program, subject to mutual agreement, within one year from the postponement date.
- PetroSync is not responsible for any loss or damage resulting from the cancellation policy and assumes no liability if the event is canceled, rescheduled, or postponed due to force majeure (e.g., natural disasters, war, government actions, industrial actions).
If PetroSync cancels, postpones, changes the trainer, or alters the training location (classroom/virtual) for any reason, and the delegate is unable or unwilling to attend on the rescheduled date, a 100% credit voucher of the paid contract fee will be issued. This credit voucher can be used for another PetroSync training program, subject to mutual agreement, within one year from the postponement date.
Yes, participants who complete the training will receive either an attendance certificate or a completion certificate, depending on the course requirements.
Yes, PetroSync courses adhere to international standards , with expert instructors in fields such as API, ASME, Reliability, and Drilling & Well Engineering.
Yes, PetroSync certificates are widely recognized and can be used to fulfill professional development and certification requirements across various industries.
Yes, PetroSync offers customized training programs tailored to your organization's specific needs (In-house Training).
Participants will receive comprehensive training materials , including slides, handouts, and direct learning from experts with case studies related to the training topic.
PetroSync trainers are industry experts with extensive experience as instructors and consultants in their respective fields, providing professional training with a strong background in the industry.
Yes, trainer profiles, including their qualifications, experience, and expertise, are available on the website: https://www.petrosync.com/training/.
Online training sessions are conducted via user-friendly platforms such as Zoom Premium.
To access PetroSync Online Training, participants need:
- A computer or laptop (tablets or smartphones are not recommended)
- A reliable broadband internet connection (minimum 4 Mbps)
- A webcam and a headset
- Any internet browser (Chrome browser recommended for a better experience)
- A reasonably quiet place
Yes, PetroSync provides live Q&A sessions with instructors to address real-world challenges encountered during training.
The average number of participants varies depending on the topic and participants’ schedules.
- The information you provide will be safeguarded by PetroSync and may be used to keep you informed of relevant products and services.
- As an international group, we may transfer your data globally for the purposes indicated above.
- If you do not wish to share your information with other reputable companies, please tick the box on the registration form.
Please fill out the form on the designated page first. Our team will reach out to you within a maximum of 2x24 hours.
The latest training schedule is available on the website: https://www.petrosync.com/training/.